Keep the decking flat to avoid warping
Prepare and clear the area, if required, lay a membrane down first
Measure and mark the required length for the frame and then cut and treat the ends of the cut wood
Mark the placement for the joists and lay the frame out in the desired area
Screw the sides and joists together
Check the corners are square, get the frame level and mark the first post
Cut the first post to size and install it
Mark the second post making sure the frame is level
Cut the second post and install it. Repeat this step for the last two posts. Double-check the frame is level
Measure the top allowing for 25mm overhang, treat the cut ends
Cut mitre joints if required for fascias
Starting from the front, lay the decking, use the required spacers
Measure and swap the final piece, if cutting is required
Materials needed
- Softwood Decking Boards
- Deck Bearers
- Decking Screws
- Weed Membrane
- Shingle
- Paving Slabs
- End Grain Preservative
Tools needed
- Mitre Saw
- Cordless Drill
- Hand Saw
- Work Bench
- Tape Measure
- Spirit Level
- Hammer
- Pencil
- Builders Square
PPE needed
- Gloves
- Safety Goggles
- Knee Pads
Watch the video now...