Keep the decking flat to avoid warping
Prepare and clear the area, if required, lay a membrane down first
Measure and mark the required length for the frame and then cut and treat the ends of the cut wood
Mark the placement for the joists and lay the frame out in the desired area
Screw the sides and joists together
Check the corners are square, get the frame level and mark the first post
Cut the first post to size and install it
Mark the second post making sure the frame is level
Cut the second post and install it. Repeat this step for the last two posts. Double-check the frame is level
Measure the top allowing for 25mm overhang
Mark the placement for the pilot holes *Ensure there is a 5mm gap all around the board and that there is 400mm distance between each joist centre
Use the correct screws to attach the boards
Use the required spacers
Materials needed
- Composite Decking Boards
- Deck Bearers
- Decking Screws
- Weed Membrane
- Shingle
- Paving Slabs
- Plastic Sheeting
Tools needed
- Mitre Saw
- Cordless Drill
- Hand Saw
- Work Bench
- Tape Measure
- Spirit Level
- Hammer
- Pencil
- Builders Square
PPE needed
- Gloves
- Safety Goggles
- Knee Pads
Watch the video now...